保障望虞河引调水期水质的引水顶托条件研究
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

X52

基金项目:

国家自然科学基金( 51179053);国家水体污染控制与治理科技重大专项( 2012ZX07506-006-05)


Study of diversion backwater conditions for ensuring water quality of Wangyu River during water diversion period
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 文章评论
    摘要:

    在现场调研和资料搜集的基础上,利用MIKE11模型建立望虞河西岸一维河网水环境数学模型,开展了望虞河西岸区域污染物总量控制计算和引水顶托条件分析,研究如何在望虞河西岸总量控制不达标的现状下通过引水顶托条件的研究来保证引调水期间望虞河入太湖水质达标。结果表明:(1)近期望虞河西岸污染物限排总量控制目标仍然无法实现;(2)当水位差值低于控制水位差时,望虞河引水;当水位差高于控制水位差时,西岸排水;(3)方案1情况下望虞河从长江连续引水19 d后需要对西岸进行一次排水;方案2情况下望虞河从长江连续引水24 d后需要对西岸进行一次排水;方案3情况下望虞河从长江连续引水10 d后需要对西岸进行一次排水;方案4情况下望虞河从长江连续引水15 d后需要对西岸进行一次排水。

    Abstract:

    Based on field investigation and data collection, a one-dimensional river network water environmental mathematical model for the west bank of the Wangyu River was established using the MIKE11 software. Total pollutant load control calculation and diversion backwater condition analysis were carried out. This study shows how to guarantee the quality standards of the water flowing from the Wangyu River into Taihu Lake during the water diversion period through study of the diversion backwater conditions, when the total pollutant load control on the west bank of the Wangyu River does not meet the standards. The results are as follows: (1)Total pollutant load control cannot be implemented on the west bank of the Wangyu River in the near future. (2)When the water head is lower than the control level, water diversion in the Wangyu River should be conducted; when the water head is higher than the control level, drainage should be conducted on the west bank. (3)In Scheme 1, drainage is required on the west bank after water diversion of the Wangyu River from the Yangtze River for 19 days; in Scheme 2, drainage is required on the west bank after water diversion of the Wangyu River from the Yangtze River for 24 days; in Scheme 3, drainage is required on the west bank after water diversion of the Wangyu River from the Yangtze River for 10 days; and in Scheme 4, drainage is required on the west bank after water diversion of the Wangyu River from the Yangtze River for 15 days.

    参考文献
    相似文献
    引证文献
引用本文

徐凌云,逄勇,付浩.保障望虞河引调水期水质的引水顶托条件研究[J].水资源保护,2016,32(3):121-126.(XU Lingyun, PANG Yong, FU Hao. Study of diversion backwater conditions for ensuring water quality of Wangyu River during water diversion period[J]. Water Resources Protection,2016,32(3):121-126.(in Chinese))

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2015-05-20
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2016-05-25
  • 出版日期: