Based on the theory of risk arena,this paper takes the event of garbage classification transfer station of BOBO community for instance to see the logic of MIMBY risk and ids operation mechanism,which may uncover the crux of Chinese NIMBY conflict dilemma. Firs,as a product of social interaction,different risk mental schema and risk construction strategy is the internal driving force of NIMBY risk operation in risk arena. Therefore,mismatching of risk cognitive structure is an important factor which may cause the failure of risk communication. Second,the rising housing consciousness and lacking of instant isolated interest expression mechanism leads to community residents' unconventional action to break game rules that unilaterally dominated by local government in order to informally express interests. Finally,the particularity of NIMBY projects shows that it is an important carrier of local leaders of economic resources and political resources. And the particularity of NIMBY projects may result in collective events,which may erode the social basis of the authority of local administration,cause ruling crisis and make it into a new round of“establishing-protesting-postponing" action.
参考文献
相似文献
引证文献
引用本文
田 鹏, 陈绍军.邻避风险的运作机制研究[J].河海大学学报(哲学社会科学版),2015,17(6):36-42.(. Study of Operation Mechanism of NIMBY Risk[J]. Journal of Hohai University (Philosophy and Socail Sciences),2015,17(6):36-42.(in Chinese))