Construction diversion risk benefit sharing model based on water diversion and storage at upstream hydropower station
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to effectively balance the risks of upstream and downstream hydropower stations and the peak load dispatching hydropower station, and reasonably share their benefits, we considered the effects of flood regulation and the storage process of the upstream station as a cooperative risk benefit and used the least core method in cooperative games to establish a least core model of diversion risk benefit sharing under the conditions of the construction of cascade hydropower stations, in order to calculate the diversion risk benefit sharing quota. A case study shows that the sharing of the diversion system and the pumped storage hydropower station exhibited negative values due to the benefits from the water diversion and flood storage at the upstream station, which means that we need to compensate the upstream hydropower station. The sharing of expenses of all the three hydropower stations varied with the change of diversion standards.

    Reference
    Related
    Cited by
Get Citation

刘潋,胡志根.上游水电站调蓄下施工导流风险效益分摊模型[J].河海大学学报(自然科学版),2014,42(6):559-564.(. Construction diversion risk benefit sharing model based on water diversion and storage at upstream hydropower station[J]. Journal of Hohai University (Natural Sciences),2014,42(6):559-564.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 05,2015
  • Published:
Article QR Code