Drawing and application strategy of dispatching diagram for water-light complementary base reservoir
CSTR:
Author:
Affiliation:

(1.College of Water Conservancy and Hydropower Engineering, Hohai University, Nanjing 210098, China;2.College of New Energy, Hohai University, Nanjing 210098, China )

Clc Number:

TV697.1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To solve the dispatching problem of water-light complementary base, a new drawing method of reservoir dispatching diagram is proposed according to the frequency group of incoming water, and the application strategy of reservoir dispatching diagram is provided. Taking the Xizang section of the upper reaches of Lancang River as an example, the results obtained by the proposed method meet the practical requirements of the project, benefit the stable operation of the power grid, and improve the efficiency of the power station.

    Reference
    Related
    Cited by
Get Citation

尹丽君,许昌,黄显峰,等.水光互补基地水库调度图绘制及应用策略[J].河海大学学报(自然科学版),2023,51(5):65-69.(YIN Lijun, XU Chang, HUANG Xianfeng, et al. Drawing and application strategy of dispatching diagram for water-light complementary base reservoir[J]. Journal of Hohai University (Natural Sciences),2023,51(5):65-69.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 23,2023
  • Revised:
  • Adopted:
  • Online: September 24,2023
  • Published:
Article QR Code