Dynamic optimal analysis of concrete temperature control and crack prevention standards and measures during dam construction for Zangmu Hydropower Station
CSTR:
Author:
Affiliation:

Clc Number:

TV642;TV544

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In regard to temperature control and crack prevention for concrete dams in plateau areas with high elevation and large temperature differences, a summary was made of research on concrete crack prevention during the construction of the first large concrete gravity dam, with a height of more than 100 meters, in the Tibet Autonomous Region. Based on on-site monitoring data during the dam construction for the Zangmu Hydropower Station, dynamic feedback simulation analysis technology was used to demonstrate the real working condition throughout the construction period. Then, risks that may occur during the later construction period were predicted according to the simulation results, and the related standards and measures for temperature control and crack prevention were adjusted and optimized.

    Reference
    Related
    Cited by
Get Citation

潘希强,刘有志,胡平,等.藏木水电站大坝混凝土施工期温控防裂标准与措施动态优化分析[J].河海大学学报(自然科学版),2015,43(4):300-306.(PAN Xiqiang, LIU Youzhi, HU Ping, et al. Dynamic optimal analysis of concrete temperature control and crack prevention standards and measures during dam construction for Zangmu Hydropower Station[J]. Journal of Hohai University (Natural Sciences),2015,43(4):300-306.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:November 12,2014
  • Revised:
  • Adopted:
  • Online: September 05,2015
  • Published:
Article QR Code