    Abstract:

    Using the techniques of system simulation, real-time monitoring, databases, and visualization, simulation and visual analysis for the construction of the storehouse surface of a roller-compacted concrete(RCC)dam was carried out. An elaborate simulation model for storehouse surface construction was established, through which detailed construction progress information can be obtained. Furthermore, interactive three-dimensional dynamic visualization analysis for storehouse surface construction was realized. These research achievements have been applied in a RCC dam in Southwest China.

    Reference
    Related
    Cited by
Get Citation

钟登华,张元坤,吴斌平,等.基于实时监控的碾压混凝土坝仓面施工仿真可视化分析[J].河海大学学报(自然科学版),2016,44(5):377-385.(ZHONG Denghua, ZHANG Yuankun, WU Binping, et al. Simulation and visual analysis for construction of storehouse surface of RCC dam based on real-time monitoring[J]. Journal of Hohai University (Natural Sciences),2016,44(5):377-385.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 19,2015
  • Revised:
  • Adopted:
  • Online: September 28,2016
  • Published:
Article QR Code