4D construction information model for core rock-fill dam and its application
CSTR:
Author:
Affiliation:

Clc Number:

TV52

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to realize the dynamic and visual integration of multi-source construction information, including quality, schedule, and cost, and to meet the need for visually analyzing the whole construction process of a core rock-fill dam, a 4D construction information model for a core rock-fill dam(3D geometric model+time dimension+multi-source construction information)is proposed based on analysis of the multi-source characteristics of the construction information. The established method of the 4D construction model was studied, including techniques for the establishment of a 3D model of the core rock-fill dam, the integration of the multi-source construction information, and the 4D visualization method in the construction process of the rock-fill dam. Practical engineering applications show that the integration and interactive analysis of multi-source information and 4D visualization of the construction process are realized based on 3DGIS, which can provide theoretical and technical support for site control and management of the rock-fill dam.

    Reference
    Related
    Cited by
Get Citation

钟登华,贾晓旭,杜成波,等.心墙堆石坝4D施工信息模型及应用[J].河海大学学报(自然科学版),2017,45(2):95-103.(ZHONG Denghua, JIA Xiaoxu, DU Chengbo, et al.4D construction information model for core rock-fill dam and its application[J]. Journal of Hohai University (Natural Sciences),2017,45(2):95-103.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:November 09,2016
  • Revised:
  • Adopted:
  • Online: March 22,2017
  • Published:
Article QR Code