Dynamic control of construction progress of core rockfill dam storehouse surface
CSTR:
Author:
Affiliation:

Clc Number:

TV511;TV641.4+1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    A dynamic control model for construction progress of the storehouse surface of core rockfill dams is proposed based on thesimulation model for construction progress and thereal-time monitoring model for construction quality of the storehouse surface, with field construction factors taken into consideration. Through optimization of the construction scheme and real-time analysis and feedback of progress deviation during the construction process with the model, the construction progress control before and during the construction process was realized. The model was applied to a core rockfill dam under construction. An optimized scheme for advance control of construction progress of a storehouse surface was chosen based on optimization and simulation analysis of multiple construction schemes. When the construction progress was stunted by unforeseen circumstances, the simulation model for storehouse surface construction was used to dynamically simulate and update the construction situation, and an optimized scheme for intermediate control of construction progress wasrecommended. The schedule of storehouse surface construction can thus be guaranteed. The application results showed that the actual construction scheme was consistent with the chosen one, only with a deviation of 23 minutes in the construction process. Therefore, the storehouse surface construction progress could be effectively controlled with the dynamic control model. As conclusions, the model can provide a reasonable and optimized construction scheme, effectively control the deviation in construction progress, and guarantee the construction progress of a storehouse surface of core rockfill dams.

    Reference
    Related
    Cited by
Get Citation

钟登华,杜荣祥,关涛,等.心墙堆石坝仓面施工进度动态控制[J].河海大学学报(自然科学版),2017,45(4):283-290.(ZHONG Denghua, DU Rongxiang, GUAN Tao, et al. Dynamic control of construction progress of core rockfill dam storehouse surface[J]. Journal of Hohai University (Natural Sciences),2017,45(4):283-290.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 06,2017
  • Revised:
  • Adopted:
  • Online: July 06,2017
  • Published:
Article QR Code