    Abstract:

    To explore a new flood control scheme adapting to the current flood pattern, the flood control scheme for “flood discharge from the nearer route” is proposed based on studying the current flood pattern. The effect of river dredging of nearer route on the flood discharge is quantitatively calculated based on the hydrodynamic model for river network in the Pearl River Delta. The results show that the discharge of Modaomen is the largest and the discharge path of Yamen is the shortest in the west four estuaries. Jiaomen had the largest discharge, and its discharge path is also the shortest in the east four estuaries. After the channel dredging, the discharge of Yamen which is the one of the west four estuaries increased by 2. 805×105 m3, and the distribution ratio increased by 0. 50%. The discharge rate of Jiaomen and Humen in the east four estuaries increased by 1. 11 ×105 m3 and 1. 537×105 m3, with a distribution ratio of 0. 20% and 0. 27%, respectively. The flood control scheme has achieved the expected effect, which can provide technical support for the implementation of the Pearl River Delta flood control program.

    Reference
    Related
    Cited by
Get Citation

肖洋,王艳,徐辉荣,等.珠江三角洲洪水就近入海防洪治理方案[J].河海大学学报(自然科学版),2021,49(3):257-264.(XIAO Yang, WANG Yan, XU Huirong, et al. Analysis on flood control scheme for flood discharge from nearer route in the Pearl River Delta[J]. Journal of Hohai University (Natural Sciences),2021,49(3):257-264.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 07,2021
  • Published:
Article QR Code