The value engineering research model is introduced into the regulation project of the main stream of Huaihe River, and the adjustment and construction project of Xiangmiao-Fushan reach is treated as the research object of value engineering. The construction preparation stage is regarded as the entry point, and the related issues such as layout of mud disposal area in the river dredging project is the research focus. Through functional analysis and program creation, by means of the reasonable minimum engineering cost, the integrated optimal functional value of river regulation is achieved. The research results are directly applied to the project construction practice so as to optimize the design and implementation schemes and to save the project investment.
参考文献
相似文献
引证文献
引用本文
刘虎,刘锦雯.价值工程在淮河干流蚌浮段工程中的应用[J].水利经济,2016,34(5):23-28.(LIU Hu, LIU Jinwen. Application of value engineering in dredging Bengbu-Fushan reach of Huaihe River[J]. Journal of Economics of Water Resources,2016,34(5):23-28.(in Chinese))