论我国水利PPP项目的纠纷及其解决
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

D912.1

基金项目:

国家社会科学基金(16BFX030)


Conflicts of PPP projects of water conservancy in China and their solutions
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 文章评论
    摘要:

    采用对比分析法,对现阶段水利PPP项目的理论学说进行梳理。针对前行政行为和后民事加行政行为2个不同阶段的法律行为属性,通过“行政诉讼+民事诉讼”的法律程序,采取区别化的解决方案,认为“行政+民事”的解决纠纷机制更有利于水利PPP项目的顺利实施及纠纷解决。

    Abstract:

    By means of the comparative analysis method, the theories of PPP projects of water conservancy at the current stage in China are reviewed. With regard to the legal attributes of two stages, pre-stage of administrative behavior and post-stage of civil and administrative behavior, different solution schemes are taken through the legal procedures of “administrative litigation+civil litigation”. It is concluded that the mechanism of “administrative litigation+civil litigation”ismore conducive to the smooth implementation of water conservancy PPP projects and the solution to conflicts.

    参考文献
    相似文献
    引证文献
引用本文

邢鸿飞,陆雨.论我国水利PPP项目的纠纷及其解决[J].水利经济,2017,35(1):9-12.(XING Hongfei, LU Yu. Conflicts of PPP projects of water conservancy in China and their solutions[J]. Journal of Economics of Water Resources,2017,35(1):9-12.(in Chinese))

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2016-10-31
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2017-01-23
  • 出版日期: