基于Shapley值修正的跨区域水电项目收益分配研究
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

F283

基金项目:

国家自然科学基金(71774048)


Income distribution of cross-regional hydropower projects based on modified Shapley value
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 文章评论
    摘要:

    跨区域水利水电建设项目因涉及众多利益主体,在各自区域内难以通过行政、经济等手段协调,导致项目长期搁置。依据公平兼顾效率、收益与风险对称等原则,运用修正的Shapley值模型来分析跨区域多个主体之间的合作对策问题,对各参与方最终分配到的收益比例进行修正协调,解决跨区域水电项目建设过程中收益分配不均的问题,达到收益公平化的结果。

    Abstract:

    Due to the large number of stakeholders involved in the construction of inter-regional hydropower projects, it is difficult to coordinate through administrative and economic measures in their respective regions, resulting in the long-term suspension of the projects. Based on the principles of fairness and efficiency, return and risk, the modified Shapley value model is used to analyze the cooperation strategies among multiple subjects in inter-regions. The proportion of revenue ultimately allocated to each participant is corrected. The uneven distribution of income during the construction of inter-regional hydropower projects is solved, and a fair return is achieved

    参考文献
    相似文献
    引证文献
引用本文

曹文英,袁汝华.基于Shapley值修正的跨区域水电项目收益分配研究[J].水利经济,2018,36(3):16-20.(CAO Wenying, YUAN Ruhua. Income distribution of cross-regional hydropower projects based on modified Shapley value[J]. Journal of Economics of Water Resources,2018,36(3):16-20.(in Chinese))

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2017-11-30
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2018-06-08
  • 出版日期: