(1.中国电建集团贵阳勘测设计研究院有限公司,贵州 贵阳550081;2.河海大学水利水电学院,江苏 南京210098 )
丁光旭(1996—),男,工程师,硕士,主要从事水利水电工程规划设计工作。E-mail:1033487543@qq.com
F426
(1.Power China Guiyang Engineering Corporation Limited, Guiyang 550081, China; 2.College of Water Conservancy and Hydropower Engineering, Hohai University, Nanjing 210098, China)
丁光旭,田思源,方国华,等.不同市场环境下贵州省抽水蓄能电站的电价形成机制研究[J].水利经济,2024,42(2):73-78.(DING Guangxu, TIAN Siyuan, FANG Guohua, et al. Study on electricity price formation mechanism of pumped storage power station under different market environments[J]. Journal of Economics of Water Resources,2024,42(2):73-78.(in Chinese))
复制