Communication and coordination mechanism among stakeholders of hydropower development in the Lancang-Mekong River Basin
CSTR:
Author:
Affiliation:

1.International Business Department, China Renewable Energy Engineering Institute; 2.Ecosystem Study Commission for International Rivers, China Society for Hydropower Engineering; 3.School of Business, Hohai University

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper identifies the stakeholders involved in hydropower development within the Lancang-Mekong River Basin. Using game-theory analysis, it examines the challenges facing the current communication and coordination mechanisms for hydropower development in the basin and proposes measures for improvement. This paper suggests that it is necessary to rely on the existing cooperation mechanism for water resources in the Lancang-Mekong River Basin, to take project cooperation as the core driving force, and to foster synergistic collaboration among the government, enterprises, international organizations, and society. Through various channels and diverse forms, a comprehensive and multi-level communication and coordination mechanism for all stakeholders in the hydropower development in the Lancang-Mekong River Basin should be constructed.

    Reference
    Related
    Cited by
Get Citation

张木梓,顾洪宾,黄德春,等.澜沧江湄公河流域水电开发利益相关方沟通协调机制研究[J].水利经济,2026,44(3):64-72, 81.(Zhang Muzi, Gu Hongbin, Huang Dechun, et al. Communication and coordination mechanism among stakeholders of hydropower development in the Lancang-Mekong River Basin[J]. Journal of Economics of Water Resources,2026,44(3):64-72, 81.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 28,2025
  • Revised:
  • Adopted:
  • Online: May 29,2026
  • Published:
Article QR Code