考虑融雪和降雨径流过程的网格化模拟方法及应用
作者:
作者单位:

(1.云南电网有限责任公司;2.河海大学水灾害防御全国重点实验室;3.河海大学水文水资源学院;4.长江保护与绿色发展研究院;5.中国气象局水文气象重点开放实验室;6.水利部水利大数据重点实验室 )

作者简介:

王一帆(1994—),男,高级工程师,博士,主要从事新能源预测管理技术研究。E-mail:wangyifan@yn.csg.cn

通讯作者:

中图分类号:

基金项目:

中国南方电网云南电网有限责任公司科技项目(YNKJXM20222329);青海省重大科技专项项目(2024-SF-A1);山东省水文中心科研项目(37000000025001720250235)


Gridded simulation method considering snowmelt and rainfall-runoff processes and its application
Author:
Affiliation:

(1.Yunnan Power Grid Co., Ltd.;2.StateKey Laboratory of Water Disaster Prevention, Hohai University;3.Collegeof Hydrology and Water Resources, Hohai University;4.YangtzeInstitute for Conservation and Development;5.Hydro MeteorologyKey Laboratory of China Meteorological Administration;6.KeyLaboratory of Water Big Data Technology of Ministry of Water Resources )

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 文章评论
    摘要:

    针对目前考虑融雪的概念性水文模型大多为集总式水文模型这一问题,以网格新安江模型为基础,通过耦合融雪模块构建了考虑融雪和降雨径流过程的网格新安江模型(iRainSnowHydro模型),以金沙江上游梨园流域和澜沧江上游乌弄龙流域为典型流域进行日径流模拟,并与集总式融雪径流模型(Hydromad模型)进行对比分析。结果表明:iRainSnowHydro模型在梨园和乌弄龙流域的日径流模拟效果均良好,率定期和验证期的决定系数和纳针效率系数均超过了0.85,百分比偏差绝对值均小于10%;iRainSnowHydro模型的模拟性能优于Hydromad模型,且其分布式结构具有显著优势。

    Abstract:

    To address the issue that most conceptual hydrological models considering snowmelt are lumped models, a gridded Xin’anjiang model considering snowmelt and rainfall-runoff processes (iRainSnowHydro model) was constructed based on the gridded Xin’anjiang model by coupling a snowmelt module. Daily runoff simulations were conducted taking the Liyuan basin in the upper reaches of the Jinsha River and the Wunonglong basin in the upper reaches of the Lancang River as typical basins, and the results were compared with those of a lumped snowmelt runoff model (Hydromad model). The results indicate that the iRainSnowHydro model exhibits good daily runoff simulation performance in both the Liyuan and Wunonglong basins, with R2 and NSE exceeding 0.85 and the absolute value of PBIAS being less than 10% in the calibration and validation periods. The simulation performance of the iRainSnowHydro model is superior to that of the Hydromad model, and its distributed structure has significant advantages.

    参考文献
    相似文献
    引证文献
引用本文

王一帆,王宇昊,张珂,等.考虑融雪和降雨径流过程的网格化模拟方法及应用[J].河海大学学报(自然科学版),2026,54(3):1-7.(Wang Yifan, Wang Yuhao, Zhang Ke, et al. Gridded simulation method considering snowmelt and rainfall-runoff processes and its application[J]. Journal of Hohai University (Natural Sciences),2026,54(3):1-7.(in Chinese))