    摘要:

    针对某抽水蓄能电站上水库主坝最大坝高达182.3m,上水库土石料料源紧张,坝基地质条件复杂,岸坡起伏差大,大坝变形及防渗结构可靠性要求高等问题,为提高大坝安全性能,研究主坝断面分区优化方案。坝体分区优化充分考虑利用上水库石料厂开挖的石料筑坝;上、下游堆石区分界线坡比采用倾向下游1∶0.4;在坝顶以下部位设置增模区;连接板向库内平移并减小转弯段曲率,并将基础垫层优化为特殊垫层及过渡料。实验表明该优化方案有效保证了结构的安全。

    Abstract:

    In view of the problems that the maximum main dam height of a pumped storage power station is 182.3m, the soil and stone material source of the upper reservoir is scarce, the geological conditions of the dam foundation are complex, the bank slope fluctuation is large, and the reliability requirements of the dam deformation and anti-seepage structure are high, a zoning optimization scheme of the main dam section was studied to improve the safety performance. The stones excavated by the stone factory in the upper reservoir is fully considered to build the dam. The slope ratio of the upstream and downstream rockfill boundary is set to be 1∶0.4. Modulus-increased zone is set below the dam crest. In order to ensure the structural safety, the connecting plate is translated into the reservoir with a reduction of the turning section curvature, and the foundation cushion is optimized into special cushion with special transition material.

    参考文献
    相似文献
    引证文献
引用本文

王樱畯,赵琳,雷显阳.某抽水蓄能电站高面板堆石坝坝体分区优化[J].水利水电科技进展,2021,41(5):47-52.(WANG Yingjun, ZHAO Lin, LEI Xianyang. Dam zoning optimization for a high concrete face rockfill dam of a pumped storage power station[J]. Advances in Science and Technology of Water Resources,2021,41(5):47-52.(in Chinese))

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2021-10-16
  • 出版日期: