软岩填筑高面板堆石坝分区及材料设计
作者:
作者单位:

(1.黄河勘测规划设计研究院有限公司,河南 郑州450003;2.华中科技大学土木与水利工程学院,湖北 武汉430074 )

作者简介:

赵大洲(1970—),男,教授级高级工程师,博士,主要从事水利工程结构设计工作。E-mail:zhaodzh@yrec.cn

通讯作者:

中图分类号:

TV641

基金项目:

黄河勘测规划设计研究院有限公司企业自主研究开发项目(2020-ky12,2019-ky02(2))


Design of dam zoning and construction materials for a high concrete-faced rock-fill dam with soft rock
Author:
Affiliation:

(1.Yellow River Engineering Consulting Co., Ltd., Zhengzhou 450003, China;2.School of Civil and Hydraulic Engineering, Huazhong University of Science and Technology,Wuhan 430074, China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 文章评论
    摘要:

    通过分析软岩不同利用方案及分区形式对高面板堆石坝力学性状的影响,获取了坝体应力和变形的变化规律。高面板堆石坝下游次堆石区中软岩含量及堆石区几何特征、主堆石体分区形式均影响面板堆石坝的力学性状。提高坝体下游堆石区的强度及刚度,可以提高各堆石区之间的协调变形能力、降低面板变形及应力。提高位于坝轴线处的堆石体承载力,可以有效降低坝体变形及面板应力。为控制高面板堆石坝的坝体变形及应力,坝轴线处坝体下部堆石区宜填筑承载力高的堆石体,下游堆石区中软岩比例不宜超过30%。

    Abstract:

    By analyzing the effects of different utilization schemes of soft rock and dam zoning forms on the mechanical properties of a high concrete-faced rock fill dam(CFRD), the characteristics about the stress and deformation of the dam were obtained. The proportion of soft rock in the downstream rock-fill zone, the geometric characteristics of the downstream rock-fill zone and the zoning form of the main rock-fill body can affect the mechanical properties of the high CFRD. With the increase of strength and stiffness of the secondary rock-fill zone in the downstream dam body, the deformation coordination between the primary rock-fill zone and the secondary rock-fill zone becomes better, and the deformation and stress of the concrete face slab are reduced. The dam deformation and face slab stress can be effectively reduced by improving the bearing capacity of the rock-fill body located at the dam axis. To control the deformation and stress of the high CFRD, the rock-fill zone at the lower part of dam body near the dam axis should be filled with the rocks of high bearing capacity, and the proportion of soft rock in the downstream rock-fill zone should not exceed 30%.

    参考文献
    相似文献
    引证文献
引用本文

赵大洲,赵宇瑶,王新奇.软岩填筑高面板堆石坝分区及材料设计[J].水利水电科技进展,2022,42(6):73-78.(ZHAO Dazhou, ZHAO Yuyao, WANG Xinqi. Design of dam zoning and construction materials for a high concrete-faced rock-fill dam with soft rock[J]. Advances in Science and Technology of Water Resources,2022,42(6):73-78.(in Chinese))