基于LSTM的泵闸工程混凝土施工期温度场预测
作者:
作者单位:

(河海大学水利水电学院, 江苏 南京210098)

作者简介:

程井(1982—),男,副教授,博士,主要从事水工结构计算力学研究。E-mail: cj042@126.com

通讯作者:

中图分类号:

TV331文献标志码:A文章编号:1006-7647

基金项目:

上海市水务局科研项目(沪水科2021-09);贵州省水利科技经费项目(KT202217);国家重点研发计划(2022YFC3005501)


Temperature field prediction during concrete construction period of pump and sluice project based on LSTM
Author:
Affiliation:

(College of Water Conservancy and Hydropower Engineering, Hohai University, Nanjing 210098, China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 文章评论
    摘要:

    为了快速准确地预测混凝土施工期温度过程线,结合主成分分析,提出了一种基于长短期记忆网络

    Abstract:

    To quickly and accurately predict the temperature history during the concrete construction period, a prediction model based on the long short-term memory (LSTM) network algorithm was proposed combined with the principal component analysis (PCA).Taking the baseboard of the Siyaogang Sluice and Bayaogang Sluice in Shanghai Chongming Island as an example, the PCA method was used to reduce the number of the possible influencing factors of the concrete temperature field, and then the LSTM prediction model of temperature history based on the temperature data of the Siyaogang Sluice baseboard was established to train the input principal components. Then the trained model was used for the fitting and prediction of the temperature history of the Bayaogang Sluice and was compared with the measured results. The results show that the predicted value fits well with the measured one with the RSM error within 2℃ and the coefficient of determination close to 1, meeting the requirements of engineering accuracy. The proposed method can partially be an alternative for FEM back-analysis, which can increase the efficiency for concrete temperature field prediction of pump and sluice projects.

    参考文献
    相似文献
    引证文献
引用本文

程井,孔垂穗,邹科辉.基于LSTM的泵闸工程混凝土施工期温度场预测[J].水利水电科技进展,2023,43(2):76-81.(CEHNG Jing, KONG Chuisui, ZOU Kehui. Temperature field prediction during concrete construction period of pump and sluice project based on LSTM[J]. Advances in Science and Technology of Water Resources,2023,43(2):76-81.(in Chinese))

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2022-05-26
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-03-10
  • 出版日期: