基于深度学习框架的长序列大坝监测缺失数据插补模型
作者:
作者单位:

(1.河海大学水利水电学院,江苏 南京210098;2.华设设计集团股份有限公司,江苏 南京210014 )

作者简介:

雷未(1992—),女,博士研究生,主要从事水工结构安全监控研究。E-mail:180202020001@hhu.edu.cn

通讯作者:

中图分类号:

TV698

基金项目:

国家自然科学基金项目(52279099)


Long-series missing data interpolation model for dam monitoring based on deep learning framework
Author:
Affiliation:

(1.College of Water Conservancy and Hydropower Engineering, Hohai University, Nanjing 210098, China;2.China Design Group Co., Ltd., Nanjing 210014, China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 文章评论
    摘要:

    由于系统故障、传感器老化等不利因素常会导致监测数据缺失,从时间序列角度出发,针对大坝监测量中间缺失数据构建了一种基于深度学习框架下的双向CNN-BiLSTM-Attention缺失数据插补模型。该模型结合卷积神经网络与长短期记忆神经网络的算法优势,通过提取时间特征,引入注意力机制优化插补过程,同时以时间步递减的权重融合正反向插补结果。以某混凝土重力坝为例,采用该模型对大坝监测量长序列缺失数据进行插补,结果表明,双向融合插补能有效消除长序列缺失数据插补时间步的累积误差,与其他插补模型相比,这种深度学习模型具有更高的插补精度。

    Abstract:

    Many unfavorable factors such as system failure and sensor aging can often lead to deviation or even lack of monitoring data. In the present study, a bi-directional CNN-BiLSTM-Attention missing data interpolation model for intermediate missing data during dam monitoring based on the deep learning framework was constructed from the perspective of time series. The characteristics of the convolution neural network and long-term and short-term memory neural network were combined to extract time features in the model. The attention mechanism was introduced to optimize the interpolation process. The forward and backward interpolation results were fused by the weights decreasing according to time steps. A concrete gravity dam was selected to verify the effectiveness of the proposed model by interpolating the long-series missing data of dam monitoring. The results indicate that bidirectional fusion interpolation can effectively overcome the cumulative error of interpolation time steps for long-series missing data, and this deep learning framework has higher interpolation accuracy compared to other interpolation models.

    参考文献
    相似文献
    引证文献
引用本文

雷未,王建,吉同元,等.基于深度学习框架的长序列大坝监测缺失数据插补模型[J].水利水电科技进展,2023,43(6):82-88.(LEI Wei, WANG Jian, JI Tongyuan, et al. Long-series missing data interpolation model for dam monitoring based on deep learning framework[J]. Advances in Science and Technology of Water Resources,2023,43(6):82-88.(in Chinese))

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2022-10-28
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-11-26
  • 出版日期: