深层隧道进流式泵站前池流态及整流措施研究
作者:
作者单位:

(1.河海大学水利水电学院,江苏 南京210098;2.河海大学农业科学与工程学院,江苏 南京211100;3.河海大学水科学研究院,江苏 南京210098 )

作者简介:

冯建刚(1976—),男,教授,博士,主要从事工程水力学研究。E-mail:jgfeng@hhu.edu.cn

通讯作者:

中图分类号:

TV675

基金项目:

江苏省创新支撑计划国际科技合作项目(BZ2023047)


Study on flow pattern and rectification measures in forebay of deep tunnel inflow pumping station
Author:
Affiliation:

(1.College of Water Conservancy and Hydropower Engineering, Hohai University, Nanjing 210098, China;2.College of Agricultural Science and Engineering, Hohai University, Nanjing 211100, China;3.Institute of Water Science and Technology, Hohai University, Nanjing 210098, China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 文章评论
    摘要:

    为改善深层隧道进流式泵站前池内的旋流、偏流等不良流态,基于RNG k-ε 湍流模型对前池流态进行数值模拟,研究适用于此类城市排涝泵站的整流措施。数值计算结果表明:泵站前池、进水池内存在局部立面旋滚、螺旋流、斜向流、流速分布上高下低等不良水力现象,致使泵站进水流道水力条件不佳;采用双层环形板和两组导流墩的组合式整流措施可抑制前池、进水池中的立面旋滚、螺旋流和斜向流流态,从而有效改善流道的进水条件,提高进水流道进口处流速分布均匀度,使泵进水状况变好,提高泵站运行的可靠性。

    Abstract:

    In order to improve undesirable flow phenomena like spinning and partial flow in forebays of deep tunnel inflow pumping stations, the flow in forebays was numerically simulated based on the RNG k-ε turbulence model, and rectification measures applicable to this kind of urban drainage pumping station were investigated. Numerical simulation results revealed the presence of several adverse hydraulic phenomena within the forebay and inlet pool of the pump station, including local vertical spinning, spiral flow, oblique flow, and uneven velocity distribution with higher velocity at the top and lower velocity at the bottom, resulting in poor hydraulic conditions in the inlet channel of the pump station. A rectification measure combining a double-layer ring plate and two groups of guide piers can suppress the vertical spinning, spiral flow and oblique flow in the forebay and inlet pool. This rectification measure significantly improves the inlet conditions of the flow channel, leading to more uniform flow velocity distribution at the inlet of the inflow channel.Consequently, the pump inflow water conditions become better, and the operation reliability of the pumping station is improved.

    参考文献
    相似文献
    引证文献
引用本文

冯建刚,曹亚萍,王晓升,等.深层隧道进流式泵站前池流态及整流措施研究[J].水利水电科技进展,2024,44(2):1-6, 21.(FENG Jiangang, CAO Yaping, WANG Xiaosheng, et al. Study on flow pattern and rectification measures in forebay of deep tunnel inflow pumping station[J]. Advances in Science and Technology of Water Resources,2024,44(2):1-6, 21.(in Chinese))

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2023-10-17
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2024-03-17
  • 出版日期: