(1.中国水利水电第七工程局有限公司,四川 成都610213;2.华能澜沧江水电股份有限公司托巴水电工程建设管理局,云南 迪庆674608 )
陈前仕(1973—),男,高级工程师,主要从事水利水电工程施工技术研究。E-mail:261036262@qq.com
TV42+2
(1.Sinohydro Engineering Bureau ;7.Co., Ltd., Chengdu 610213,China;2.Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China)
陈前仕,黄芳芳,何绍波,等.大倾角下运输送机在TB水电工程砂石系统中的应用[J].水利水电科技进展,2024,44(z1):56-59.(CHEN Qianshi, HUANG Fangfang, HE Shaobo, et al. Application of downward belt conveyor with large inclination in sandstone system of TB Hydropower Project[J]. Advances in Science and Technology of Water Resources,2024,44(z1):56-59.(in Chinese))
复制