TB水电工程施工期监测自动化关键技术应用研究
作者:
作者单位:

(1.中国电建集团昆明勘测设计研究院有限公司,云南 昆明650051;2.华能澜沧江水电股份有限公司托巴水电工程建设管理局,云南 迪庆674608 )

作者简介:

董常文(1996—),男,助理工程师,主要从事监测自动化系统研究。E-mail:1352838783@qq.com

通讯作者:

中图分类号:

TV134.1

基金项目:


Application research on key technologies for automated monitoring during the construction period of TB Hydropower Project
Author:
Affiliation:

(1.POWERCHINA Kunming Engineering Corporation Limited, Kunming 650051, China;2.Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 文章评论
    摘要:

    TB水电工程从施工初期即同步实施监测自动化,在现场无永久电源、无有线通信实施条件、施工干扰大的环境下,依据现场情况,通过采用太阳能、施工临时电源或蓄电池配低功耗自休眠模式解决供电问题,采用无线通信、临时光缆、LORA 信号中继等解决通信问题,成功实现了施工期高频次、长时段自动观测的难题,确保施工期全时段监测数据的完整性,施工完成后完善相关系统即可无缝转为永久自动化监测系统,为指导工程施工、监测预警提供坚实的数据支持。

    Abstract:

    From the early stages of construction, the TB Hydropower Project has simultaneously implemented automated monitoring. In an environment with no permanent power supply, no conditions for wired communication, and significant construction interference, solutions were devised based on the on-site situation. Power supply issues were resolved using solar energy, temporary construction power sources, or batteries with low-power self-sleep modes. Communication issues were addressed using wireless communication, temporary optical cables, and LORA signal relays. These measures successfully realized high-frequency, long-duration automated observations during the construction period, ensuring the completeness of monitoring data throughout the entire construction period. Upon completion of construction, the related systems can be seamlessly transitioned into a permanent automated monitoring system, providing robust data support for guiding construction, monitoring, and early warning.

    参考文献
    相似文献
    引证文献
引用本文

董常文,邹兴宏,王李俊,等. TB水电工程施工期监测自动化关键技术应用研究[J].水利水电科技进展,2024,44(z1):86-90.(DONG Changwen, ZOU Xinghong, WANG Lijun, et al. Application research on key technologies for automated monitoring during the construction period of TB Hydropower Project[J]. Advances in Science and Technology of Water Resources,2024,44(z1):86-90.(in Chinese))