TB水电工程碾压混凝土取长芯施工技术
作者:
作者单位:

(1.中国水利水电第八工程局有限公司,湖南 长沙410004;2.华能澜沧江水电股份有限公司托巴水电工程建设管理局,云南 迪庆674608;3.中国水利水电建设工程咨询西北有限公司,陕西 西安710100)

作者简介:

彭林峰(1989—),男,工程师,主要从事水利水电施工技术研究。E-mail:547118356@qq.com

通讯作者:

中图分类号:

TV642.2

基金项目:


Construction technique of roller compacted concrete coring in TB Hydroelectric Project
Author:
Affiliation:

(1.Sinohydro Engineering Bureau 8.Co., Ltd., Changsha 410004, China;2.Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China;3.China Northwest Water Conservacy & Hydropower Engineering Consulting Co., Ltd., Xi’an 710100, China )

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 文章评论
    摘要:

    TB水电工程于15坝段1 693.8 m高程取出一根直径250 mm、长度26.5 m的长混凝土芯样,芯样完整,表面光滑致密,层间结合良好。结合钻孔实际情况,对混凝土取长芯施工过程中的钻机选型、材料加工要求、钻孔过程控制等施工技术进行研究。结果表明:施工过程选用GQ-60型工程钻机;取芯范围内的碾压混凝土采用斜层碾压施工技术;取芯施工过程中应使用同一个钻头和扩孔器,钻头胎体硬度应与混凝土强度相匹配,混凝土强度应满足施工要求。

    Abstract:

    A long concrete core sample with a diameter of 250 mm and a length of 26.5 m was taken from the 15 dam section at an elevation of 1 693.8 m in TB Hydropower Project. The core sample was intact, with a smooth and dense surface and good interlayer bonding. Based on the actual situation of drilling, research was conducted on the selection of drilling machines, material processing requirements, drilling process control, and other construction techniques during the construction process of the concrete long core. The results indicate that GQ-60 engineering drilling rig was selected for the construction process. The roller compacted concrete within the core range adopts inclined layer rolling construction technique. During the coring construction process, the same drill bit and reamer should be used, and the hardness of the drill bit body should match the strength of the concrete, which should meet the construction requirements.

    参考文献
    相似文献
    引证文献
引用本文

彭林峰,李乃利,宋西锋,等. TB水电工程碾压混凝土取长芯施工技术[J].水利水电科技进展,2024,44(z1):144-146.(PENG Linfeng, LI Naili, SONG Xifeng, et al. Construction technique of roller compacted concrete coring in TB Hydroelectric Project[J]. Advances in Science and Technology of Water Resources,2024,44(z1):144-146.(in Chinese))

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2024-09-22
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2025-04-06
  • 出版日期: