某工程排沙洞弧形工作闸门后流道空蚀破坏成因的试验研究
作者:
作者单位:

(1.四川大学水利水电学院;2.四川大学山区河流保护与治理全国重点实验室 )

作者简介:

向品宇(2005—),男,博士研究生,主要从事水利工程研究。E-mail:1529648514@qq.com

通讯作者:

中图分类号:

TV131.3

基金项目:

国家自然科学基金区域创新发展联合基金项目(U23A20668)


Experimental study on causes of cavitation erosion damage in flow passage downstream of a radial service gate in a sediment flushing tunnel of a project
Author:
Affiliation:

(1.Collegeof Water Resources and Hydropower, Sichuan University;2.StateKey Laboratory of Hydraulics and Mountain River Engineering, Sichuan University)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 文章评论
    摘要:

    结合国内某工程排沙洞运行过程中弧形闸门出口侧墙空蚀破坏的实例,采用水力学模型试验方法,研究了不同开度运行条件下弧形闸门出口区域的水流特性及壁面压力特性,并对空蚀破坏的成因进行了深入分析。结果表明:弧形闸门全开时,掺气设施运行情况良好,不易发生空蚀破坏;弧形闸门局开时,出口水流横向扩散角增大,侧空腔长度迅速缩短,水流冲击区下游压力迅速降低,致使该区域水流空化数较小,并伴有侧墙清水区,从而加剧空蚀破坏风险;清水区的范围与破坏范围基本一致。

    Abstract:

    Based on a case of cavitation erosion damage on the sidewalls at the outlet of a radial gate during the operation of a sediment flushing tunnel in a domestic hydraulic project, hydraulic model tests were conducted to study the flow characteristics and wall pressure characteristics in the outlet region of the radial gate under different opening conditions, and the causes of cavitation erosion damage were thoroughly analyzed. The results show that when the radial gate is fully open, the aeration facility operates well and cavitation erosion damage is unlikely to occur. When the radial gate is partially open, the lateral diffusion angle of the outlet flow increases, the length of the side cavity shortens rapidly, and the pressure downstream of the flow impingement zone drops rapidly, resulting in a relatively small cavitation number in this region and the presence of a clear-water zone on the sidewall, which intensifies the risk of cavitation erosion damage. The extent of the clear-water zone is basically consistent with that of the damage zone.

    参考文献
    相似文献
    引证文献
引用本文

向品宇,宋锬焘,邓军.某工程排沙洞弧形工作闸门后流道空蚀破坏成因的试验研究[J].水利水电科技进展,2026,46(5):96-101.(Xiang Pinyu, Song Tantao, Deng Jun. Experimental study on causes of cavitation erosion damage in flow passage downstream of a radial service gate in a sediment flushing tunnel of a project[J]. Advances in Science and Technology of Water Resources,2026,46(5):96-101.(in Chinese))

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2025-05-13
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2026-10-12
  • 出版日期: