TV331
江苏省水利科技重点项目(2013110)
钱祖宾,马志华,江守燕,等.高港枢纽二线船闸地连墙板桩结构整体数值模拟[J].水利水电科技进展,2015,35(6):62-67.(QIAN Zubin, MA Zhihua, JIANG Shouyan, et al. Finite element model of sheet-pile structures with underground retaining walls in Gaogang second-line shiplock project and its numerical verification[J]. Advances in Science and Technology of Water Resources,2015,35(6):62-67.(in Chinese))
复制