江坪河水电站坝址区初始地应力场-三维数值反演分析
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TU431

基金项目:

国家自然科学基金(40372127);中国地质调查局国土资源大调查项目(12120114069501)


Three-dimensional numerical inverse analysis of initial geostress field at dam site of Jiangpinghe Hydropower Station
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 文章评论
    摘要:

    在对江坪河水电站区域地应力场特征进行实测分析的基础上,通过对三维模型施加不同的边界载荷,对比分析应力拟合点处的计算应力与实测应力,采用三维数值分析方法对水电工程坝址区初始地应力场进行反演分析。结果表明:江坪河水电站坝址区初始地应力场量值较低,最大主应力为2.5MPa,方向为N45°W;最小主应力为1.5MPa,方向为N45°E。应力拟合点处应力计算值与实测值较为接近,表明反演得到的坝址区初始地应力场是合理的,符合坝址区地质构造历史背景。

    Abstract:

    Based on analysis and measurement of a geostress field at the dam site of the Jiangpinghe Hydropower Station, and comparison of calculated and measured stress at the points for stress fitting, inverse analysis of the initial geostress field at the dam site of the Jiangpinghe Hydropower Station was conducted using a threedimensional numerical model with different boundary loading conditions. The results show that the initial geostress is low at the dam site of the Jiangpinghe Hydropower Station, the maximum principal stress is 2.5MPa and its direction is N45°W, and the minimum principal stress is 1.5MPa with a direction of N45°E. There is agreement between the calculated and measured stress at the points for stress fitting, indicating that the initial geostress field at the dam site obtained by inverse analysis is reasonable and conforms to the historical background of the geological structure.

    参考文献
    相似文献
    引证文献
引用本文

周洪福,王春山,聂德新,等.江坪河水电站坝址区初始地应力场-三维数值反演分析[J].水利水电科技进展,2016,36(1):82-85.(ZHOU Hongfu, WANG Chunshan, NIE Dexin, et al. Three-dimensional numerical inverse analysis of initial geostress field at dam site of Jiangpinghe Hydropower Station[J]. Advances in Science and Technology of Water Resources,2016,36(1):82-85.(in Chinese))

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2016-01-25
  • 出版日期: 2016-01-05