TV741;TU457
国家自然科学基金(50778070)
蒋中明,李双龙,冯树荣,等.向家坝水电站左岸近坝边坡抬升变形数值模拟[J].水利水电科技进展,2018,38(4):64-69.(JIANG Zhongming, LI Shuanglong, FENG Shurong, et al. Numerical simulation of uplift deformation of left bank slope near dam of Xiangjiaba Hydropower Station[J]. Advances in Science and Technology of Water Resources,2018,38(4):64-69.(in Chinese))
复制