    摘要:

    为解决白鹤滩水电站料场有用料储量不足的问题,依据储量复核结果,重点考虑现场地质条件、开挖面貌、扩挖时机、施工条件、经济性等因素,对补充开采规划方案进行了优选设计,并提出了3个补充开采规划方案。依据有用料储量、扩挖时机、施工条件、经济性4项评价指标,运用线性加权和法对3个方案进行了对比分析。结果表明,方案3为最优的规划方案,其扩挖后能增加有用料380万m3,可确保大坝混凝土工程骨料的供应,保障白鹤滩水电站的顺利建设。

    Abstract:

    To solve the shortage of useful materials in Baihetan Hydropower Station aggregate storage, taking the site geological conditions, excavation features and time, construction conditions, and economy into consideration, three supplementary mining scheduling programs are designed and optimized based on the re-examined results of the storage. With the help of linear weighted sum(LWS)method, the proposed three mining plans are analyzed for comparison based on four evaluation indexes, including the reserved useful materials, excavation time, construction conditions, and economy. The result shows that the third exploitation plan is the best that can increase 3. 8 million cubic meters of useful materials after excavating. It ensures the supply of aggregate content for the dam concrete program and guarantees the construction of Baihetan Hydropower Station.

    参考文献
    [1] 张为民,徐建强,计金华.金沙江白鹤滩水电站工程建设时机的选择[J].水力发电,2003,29(6):1-4.(ZHANG Weimin,XU Jianqiang,JI Jinhua.Baihetan Hydropower Project on Jinshajiang River and timing of project construction[J].Water Power,2003,29(6): 1-4.(in Chinese))
    [2] 王彪.施甸县红谷田水库石料场开采规划与实施[J].大坝与安全,2017(6):88-91.(WANG Biao.Planning and implementation of quarrying for Honggutian reservoir in Shidian County[J].Dam and Safety,2017(6): 88-91.(in Chinese))
    [3] 胡志根,肖焕雄.砂石料料场规划模型研究[J].水电站设计,1995,11(2):16-21.(HU Zhigen,XIAO Huanxiong.Model research of aggregate borrow area planning[J].Design of Hydroelectric Power Station,1995,11(2): 16-21.(in Chinese))
    [4] 何四平.小湾水电站开挖有用料规划设计[J].云南水力发电,2007,23(3):57-60.(HE Siping.Planning and design of useful materials for excavation of Xiaowan Hydropower Station[J].Yunnan Water Power,2007,23(3): 57-60.(in Chinese))
    [5] 刚永才.毛尔盖大坝堆石料料源规划及开采[J].水力发电,2018,44(2):95-97.(GANG Yongcai.Source planning and mining of rockfill material for Maoergai Dam[J].Water Power,2018,44(2): 95-97.(in Chinese))
    [6] 汤华勇,董庆煊.小湾水电站孔雀沟砂石系统的规划设计与管理[J].水力发电,2009,35(9):46-48.(TANG Huayong,DONG Qingxuan.Planning,design and management of kongquegou aggregate system of Xiaowan Hydropower Station[J].Water Power,2009,35(9): 46-48.(in Chinese))
    [7] 胡毓达.实用多目标最优化[M].上海:上海科学技术出版社,1990.
    [8] 徐玖平,李军.多目标决策的理论与方法[M].北京:清华大学出版社,2005.
    [9] 孙玮玮,李雷.基于线性加权和法的大坝风险后果综合评价模型[J].中国农村水利水电,2011(7):88-90.(SUN Weiwei,LI Lei.The comprehensive hazard assessment model for the consequences caused by the dam failure based on the linear weighted Method[J].China Rural Water and Hydropower,2011(7): 88-90.(in Chinese))
    [10] 邹进,袁晓辉,李承军,等.基于模糊控制原理的多目标决策方法[J].水利水电科技进展,2003,23(3):28-30.(ZOU Jin,YUAN Xiaohui,LI Chengjun,et al.Multi-objective decision-making method based on fuzzy control principle[J].Advances in Science and Technology of Water Resources,2003,23(3): 28-30.(in Chinese))
    [11] 薛守义.论岩土工程类比设计原理[J].岩土工程学报,2010,32(8):1279-1283.(XUE Shouyi.On analogical design of geotechnical engineering[J].Chinese Journal of Geotechnical Engineering,2010,32(8): 1279-1283.(in Chinese))
    [12] 蔡小辉,张瀚,伍仪保.基于改进层次分析法的卡基娃电站面板堆石坝料场优化前后的风险评价[J].陕西水利,2011(4):63-65.
    引证文献
    网友评论
    网友评论
    分享到微博
    发 布
引用本文

丁晓唐,覃牧,崔恩豪.白鹤滩水电站料场补充开采规划优选设计[J].水利水电科技进展,2018,38(5):43-47.(DING Xiaotang, QIN Mu, CUI Enhao. Design and optimization of supplementary mining plans for aggregate storage in Baihetan Hydropower Station[J]. Advances in Science and Technology of Water Resources,2018,38(5):43-47.(in Chinese))

复制
分享
文章指标
  • 点击次数:1659
  • 下载次数: 2012
  • HTML阅读次数: 0
  • 引用次数: 0
历史
  • 收稿日期:2018-04-25
  • 在线发布日期: 2018-09-27