    摘要:

    采用Pettitt非参数检验法和Mann-Kendall非参数趋势检验法分析肯斯瓦特水库年最大洪峰流量序列非一致性,确定序列变异形式,利用“分解-合成”理论进行一致性修正,得到过去、现状两种条件下年最大洪峰流量序列,将其作为水库入库融雪洪水过程,根据水库防洪调度规则进行调洪演算,并通过频率分析法对两种条件下水库极限防洪风险率进行分析计算。结果表明:年最大洪峰流量序列在1993年发生变异,序列整体上升趋势不显著,跳跃变异为序列主要变异形式;根据两种条件下水库坝前最高库水位,以校核洪水位Zd=993.35 m为水库极限防洪风险控制指标,过去条件下肯斯瓦特水库极限防洪风险率为0.231 23%,而现状条件下为0.354 58%,两种条件下复核后的肯斯瓦特水库极限防洪风险率均大于5 000年一遇的校核标准0.02%。

    Abstract:

    Pettitt test and Mann-Kendall test were used to analyze the inconsistency of the annual maximum flood peak discharge sequence of the Ken Swart Reservoir, and the variant form of the sequence was determined. The consistent correction was conducted based on the theory of decomposition-synthesis, and then the annual maximum peak discharge sequence under the conditions of past and present was obtained. Taking it as the inflow process of the reservoir, the flood regulation routing was carried out according to the flood control and regulation rules, and the extreme flood risk rate of the reservoir under the two different conditions were calculated using frequency analysis method. The results show that the change point of the annual maximum peak discharge sequence occurred in 1993, whereas the overall rising trend of the sequence was not significant, and the jumping variation was the main variant form. According to the maximum water level of the reservoir under the two conditions, the check flood level(Zd = 993. 35 m)was taken as the control index of the extreme flood control risk. The extreme risk rate of the flood control was 0. 231 23% under the past condition, while it was 0. 354 58% under the present condition. The rechecked extreme flood control risk rate of the Ken Swart Reservoir was larger than the 5 000-year check standard(0. 02%)under both conditions.

    参考文献
    相似文献
    引证文献
引用本文

陈伏龙,李绍飞,冯平,等.考虑融雪洪水跳跃变异的水库极限防洪风险复核[J].水利水电科技进展,2019,39(6):9-16.(CHEN Fulong, LI Shaofei, FENG Ping, et al. Recheck analysis of reservoir extreme flood control risk considering snowmelt flood sequences with jump up components[J]. Advances in Science and Technology of Water Resources,2019,39(6):9-16.(in Chinese))

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2019-12-24
  • 出版日期: