基于正交试验法的平原圩区排涝泵站优化调度
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TV877

基金项目:

江苏省自然科学基金(BK20181310);中央高校基本科研业务费专项(2019B45314)


Optimal operation of drainage pumping station in plain polder area based on orthogonal test method
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 文章评论
    摘要:

    为提高排涝泵站的防洪除涝效率,通过构建圩区排涝泵站的优化调度模型,制定对应的正交试验方案,运用遗传算法对试验方案进行优化求解,得到圩区排涝泵站在“等功耗下排水量最大”的优化调度方案。结果表明,正交试验法可缩短优化调度方案的制定周期,其优选出的泵站调度方案可有效提高排涝泵站的防洪除涝效率。

    Abstract:

    In order to improve the flood control and drainage efficiency of drainage pumping stations, an optimal scheduling model for a drainage pumping station in the polder area was established. Corresponding orthogonal test plan was formulated and the genetic algorithm was used to optimize and solve the testing scheme. The optimal dispatching scheme of maximum displacement under power consumption was obtained and the example shows that the orthogonal test method can effectively improve the flood control and drainage efficiency for drainage pump stations.

    参考文献
    相似文献
    引证文献
引用本文

高玉琴,杜承霖,张泽宇,等.基于正交试验法的平原圩区排涝泵站优化调度[J].水利水电科技进展,2020,40(6):48-53.(GAO Yuqin, DU Chenglin, ZHANG Zeyu, et al. Optimal operation of drainage pumping station in plain polder area based on orthogonal test method[J]. Advances in Science and Technology of Water Resources,2020,40(6):48-53.(in Chinese))

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2020-12-11
  • 出版日期: