Collapse scheme of rubber dam group in Yihe River based on numerical model
CSTR:
Author:
Affiliation:

Clc Number:

TV649

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The hydrodynamic numerical model of the Yihe River was established based on MIKE 11 software, and the model was verified by using the measured data. Six rubber dams along the Yihe River and the Benghe River were selected, among which the discharge process of each single rubber dam was calculated first and then the joint application of rubber dams was studied according to the scheduling principle of the dam group. The results show that in the condition of 4 hours collapsing time for all the dams, the peak discharge downstream the Linyi section is 1.427 m3/s and the peak discharge of the Xiaobudong rubber dam is 1.414 m3/s. The increase of discharge is less than 1% after the operation of rubber dam group. The scheme of dam collapse is put forward under the flood condition in 2022, in which the flood forecasting time upstream the Linyi section is longer than 8.95 hours. The proposed dam collapse scheme can store the water in advance and the peak flow discharge is not increased.

    Reference
    Related
    Cited by
Get Citation

陈界仁,赵悦君,任磊,等.基于数学模型的沂河橡胶坝群塌坝方案[J].水利水电科技进展,2022,42(1):75-79.(CHEN Jieren, ZHAO Yuejun, REN Lei, et al. Collapse scheme of rubber dam group in Yihe River based on numerical model[J]. Advances in Science and Technology of Water Resources,2022,42(1):75-79.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 08,2022
  • Published:
Article QR Code