(1.Power China Huadong Engineering Corporation Limited,Hangzhou 310014,China;2.Geotechnical Engineering Department,Nanjing Hydraulic Research Institute,Nanjing 210024,China)
王樱畯,雷显阳,姜晓桢,等.抽水蓄能电站进出水口土工膜局部变形适应性分析[J].水利水电科技进展,2022,42(4):51-54, 73.(WANG Yingjun, LEI Xianyang, JIANG Xiaozhen, et al. Adaptability analysis of local deformation of geomembrane at inlet and outlet of a pumped storage power station[J]. Advances in Science and Technology of Water Resources,2022,42(4):51-54, 73.(in Chinese))