(1.Sichuan Datang International Ganzi Hydroelectric Co., Ltd., Kangding 626001, China;2.Datang Hydropower Science & Technology Research Institute Co., Ltd., Nanning 530007, China;3.College of Water Conservancy and Hydropower Engineering, Hohai University, Nanjing 210098, China)
TV223.4
王相烜,刘得潭,何传凯,等.长河坝水电站特高心墙堆石坝双防渗墙渗流控制特性反演分析[J].水利水电科技进展,2023,43(5):88-93, 99.(WANG Xiangxuan, LIU Detan, HE Chuankai, et al. Inversion analysis on seepage control characteristics of double cut-off walls for the extra-high core rockfill dam at Changheba Hydropower Station[J]. Advances in Science and Technology of Water Resources,2023,43(5):88-93, 99.(in Chinese))