Study on cumulative effects of rectification on water conveyance structures in Middle Route of South-to-North Water Diversion Project
CSTR:
Author:
Affiliation:

(1.China South-to-North Water Diversion Middle Route Corporation Limited, Beijing 100038, China;2.College of Water Conservancy and Hydropower Engineering, Hohai University, Nanjing 210098, China;3.River Management Office of Suzhou, Suzhou 215124, China)

Clc Number:

TV135.1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to analyze the impact of rectification of water conveyance structures on the water diversion capacity of the Middle Route Project of the South-to-North Water Diversion Project, taking the section from the gate of Taocha canal to the Shierlihe aqueduct as an example, a coupled one- and two-dimensional hydrodynamic model was established, with the one-dimensional model adopted for the channel section and the two-dimensional model adopted for the sections of the four water conveyance structures (the Diaohe aqueduct, Tuanhe aqueduct, Yanlinghe aqueduct and Qihe inverted siphon). The coupled model was calibrated with multi-year measured data. Fifteen rectification schemes and a scheme without rectification were simulated to analyze the impact of different schemes on the upstream and downstream sections and to explore the rectification scheme with the minimum head loss. The results show that the impact range of rectification is from 3 to 5 km upstream and downstream of a single structure and the cumulative effect of multiple structures is less than that of the linear superposition of single structures. The effect of rectification of the two water conveyance structures (the Tuanhe aqueduct and Yanlinghe aqueduct) in the middle of the channel section is better than that of the two water conveyance structures (the Diaohe aqueduct and Qihe inverted siphon) in the upstream and downstream sections.

    Reference
    Related
    Cited by
Get Citation

陈晓楠,白一墨,胡羽蝶,等.南水北调中线工程输水建筑物整流累积效应研究[J].水利水电科技进展,2024,44(2):61-65, 98.(CHEN Xiaonan, BAI Yimo, HU Yudie, et al. Study on cumulative effects of rectification on water conveyance structures in Middle Route of South-to-North Water Diversion Project[J]. Advances in Science and Technology of Water Resources,2024,44(2):61-65, 98.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 13,2023
  • Revised:
  • Adopted:
  • Online: March 17,2024
  • Published:
Article QR Code