Review of TB Hydropower Project construction management
CSTR:
Author:
Affiliation:

(Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China)

Clc Number:

TV698.2

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    From a management perspective, this paper introduces to the construction of the TB Hydropower Project, with a focus on the achievements in the construction management in terms of organizational management, safety management, quality management, environmental and water protection management, schedule management, mechanical and electrical installation, technological innovation, intelligent construction, and corporate social responsibility. The TB Hydropower Project adopts the management mode of “integration of construction and management” and fully incorporates green and intelligent construction technologies, achieving comprehensive intelligent control over the project construction. The successful practice of the TB Hydropower Project provides valuable experience and insights for the construction of hydropower projects in China.

    Reference
    Related
    Cited by
Get Citation

段川,刘金山,贺华清,等. TB水电工程建设管理综述[J].水利水电科技进展,2024,44(z1):1-5, 37.(DUAN Chuan, LIU Jinshan, HE Huaqing, et al. Review of TB Hydropower Project construction management[J]. Advances in Science and Technology of Water Resources,2024,44(z1):1-5, 37.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 20,2024
  • Revised:
  • Adopted:
  • Online: April 06,2025
  • Published:
Article QR Code