Innovation and practice in design and technical management of TB Hydropower Project
CSTR:
Author:
Affiliation:

(Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China)

Clc Number:

TV51

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The TB Hydropower Project is located in the canyon area of northwest Yunnan, with poor natural conditions, complex geological conditions, high technical difficulties, long construction lines, tight schedules, overlapping peak periods, short design cycles, and high technical requirements. To build a 158 m roller compacted concrete gravity dam project with high quality, the construction unit needs to carefully plan and organize. By reviewing the design technology management system, management mode, scientific research planning and breakthrough, design optimization, and other related work during the construction process of TB Hydropower Project, the innovation and practical process of project design and technology management has been analyzed and summarized, which can provide reference for the management of similar projects at home and abroad.

    Reference
    Related
    Cited by
Get Citation

张天伟,刘金山,李志,等. TB水电工程设计及技术管理创新与实践[J].水利水电科技进展,2024,44(z1):6-12.(ZHANG Tianwei, LIU Jinshan, LI Zhi, et al. Innovation and practice in design and technical management of TB Hydropower Project[J]. Advances in Science and Technology of Water Resources,2024,44(z1):6-12.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 29,2024
  • Revised:
  • Adopted:
  • Online: April 06,2025
  • Published:
Article QR Code