Research on key technologies for construction of underground powerhouse cavern group
CSTR:
Author:
Affiliation:

(1.Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China;2.Sinohydro Engineering Bureau 1;4.Co., Ltd., Kunming 650041, China)

Clc Number:

TV554

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In response to the complex geological and structural characteristics, as well as the difficulty of construction, of the underground powerhouse cavern group in the TB hydropower Project, the main construction techniques was summarized. The results show that the main construction technologies for the underground powerhouse cavern group include excavation technology for rock wall beams, deep hole pre splitting excavation technology for high side walls, one hole to bottom fine blasting technology, reserved rock cover method technology for the main powerhouse, slag removal technology for inclined shaft small excavators, rapid protection technology for secondary deformation cracking and block falling of large caverns, rope saw cutting technology for ventilation shafts of turbine oil depots, inclined shaft concrete sliding mode construction technology, high flow self compacting expansive concrete construction technology, plain concrete construction technology for water transmission and power generation system frame structure without decoration, circular and turning technology for pressure steel pipe tunnels, and intelligent welding technology for pressure steel pipes. In the intelligent construction process of underground powerhouse cavern group, a smart construction management platform was established using BIM and IoT technology, achieving refined management and intelligent control of construction technology.

    Reference
    Related
    Cited by
Get Citation

何绍波,何国锋,何金龙,等.地下厂房洞室群施工关键技术研究[J].水利水电科技进展,2024,44(z1):28-33.(HE Shaobo, HE Guofeng, HE Jinlong, et al. Research on key technologies for construction of underground powerhouse cavern group[J]. Advances in Science and Technology of Water Resources,2024,44(z1):28-33.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 23,2024
  • Revised:
  • Adopted:
  • Online: April 06,2025
  • Published:
Article QR Code