    Abstract:

    In response to the narrow site, high monthly peak intensity of refrigerated concrete, and difficult system layout of the TB Hydropower Project concrete production system, a “three-dimensional multi-level, planar multi module” approach was adopted according to local conditions. Intensive refrigeration equipment and other construction techniques that save space were utilized, combined with the production process flow to reasonably arrange the various components of the system, solving the problem of limited space, meeting the peak demand for concrete production, and ensuring the quality of concrete pouring.

    Reference
    Related
    Cited by
Get Citation

向崎伟,吴都督,安辉,等.狭窄河谷大型混凝土生产系统布置[J].水利水电科技进展,2024,44(z1):34-37.(XIANG Qiwei, WU Dudu, AN Hui, et al. Layout of large concrete production system in narrow river valley[J]. Advances in Science and Technology of Water Resources,2024,44(z1):34-37.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 23,2024
  • Revised:
  • Adopted:
  • Online: April 06,2025
  • Published:
Article QR Code