(Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China)
TV734
兰东宏,昝亚锋,齐巨涛,等.水电站机电设备全过程集约化管理浅析[J].水利水电科技进展,2024,44(z1):38-41.(LAN Donghong, ZAN Yafeng, QI Jutao, et al. Brief analysis of the entire-process intensive management of mechanical and electrical equipment in hydropower stations[J]. Advances in Science and Technology of Water Resources,2024,44(z1):38-41.(in Chinese))
Copy
