(Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China)
TV52
倪磊,张天伟,何绍波,等.碾压混凝土坝通仓大斜层滚动浇筑技术[J].水利水电科技进展,2024,44(z1):42-44, 96.(NI Lei, ZHANG Tianwei, HE Shaobo, et al. Continuous rolling placement technology for large inclined layer of roller compacted concrete dam[J]. Advances in Science and Technology of Water Resources,2024,44(z1):42-44, 96.(in Chinese))
Copy
