A review of intelligent construction and application of underground plants
CSTR:
Author:
Affiliation:

(1.Sinohydro Engineering Bureau 1;4.Co., Ltd., Kunming 650041, China;2.Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China)

Clc Number:

TV52

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In line with Huaneng Group’s vision of building the TB Hydropower Project into a “green and smart power station”, the construction of the underground power plant at the TB Hydropower Project was carried out in conjunction with the construction and application of intelligent construction projects. With the methods of internet of things, radio frequency identification (RFID), data acquisition, and cloud technology, intelligent ventilation of underground caverns, underground construction that operates akin to surface-level projects, as well as the visualization, informatization, digitization, and intelligentization of the construction site were achieved. These achievements have led to breakthroughs in intelligent construction technology for hydropower projects, improving the standards of construction and management. This progress has firmly established the groundwork for the TB Hydropower Project to realize its ambition of becoming a “green and smart power station”.

    Reference
    Related
    Cited by
Get Citation

何国锋,张发斌,孙家波,等.地下厂房智能建造建设与应用综述[J].水利水电科技进展,2024,44(z1):51-55, 59.(HE Guofeng, ZHANG Fabin, SUN Jiabo, et al. A review of intelligent construction and application of underground plants[J]. Advances in Science and Technology of Water Resources,2024,44(z1):51-55, 59.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 23,2024
  • Revised:
  • Adopted:
  • Online: April 06,2025
  • Published:
Article QR Code