(1.Sinohydro Engineering Bureau ;7.Co., Ltd., Chengdu 610213,China;2.Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China)
TV42+2
陈前仕,黄芳芳,何绍波,等.大倾角下运输送机在TB水电工程砂石系统中的应用[J].水利水电科技进展,2024,44(z1):56-59.(CHEN Qianshi, HUANG Fangfang, HE Shaobo, et al. Application of downward belt conveyor with large inclination in sandstone system of TB Hydropower Project[J]. Advances in Science and Technology of Water Resources,2024,44(z1):56-59.(in Chinese))
Copy
