Intelligent monitoring and feedback for the entire process of large underground cavern excavation
CSTR:
Author:
Affiliation:

(1.POWERCHINA Kunming Engineering Corporation Limited, Kunming 650041, China;2.Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China)

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The necessity, feasibility, difficulties, and corresponding measures of intelligent monitoring during the excavation period of large underground caverns are systematically introduced, and the results are analyzed, aiming to provide a reference for the automated monitoring of other hydropower project excavations.

    Reference
    Related
    Cited by
Get Citation

邹兴宏,魏大晗,董常文,等.大型地下洞室开挖期全过程智能监测反馈[J].水利水电科技进展,2024,44(z1):71-73.(ZOU Xinghong, WEI Dahan, DONG Changwen, et al. Intelligent monitoring and feedback for the entire process of large underground cavern excavation[J]. Advances in Science and Technology of Water Resources,2024,44(z1):71-73.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 23,2024
  • Revised:
  • Adopted:
  • Online: April 06,2025
  • Published:
Article QR Code