Study on “controlling discharge to assist river closure” mode for upstream and downstream power stations of river basin company
CSTR:
Author:
Affiliation:

(1.State Key Laboratory of Water Resources Engineering and Management, Wuhan University, Wuhan 430072, China;2.Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China;3.Yunnan Dianzhong Water Diversion Engineering Co., Ltd., Kunmin 650051, China;4.Sinohydro Engineering Bureau 8.Co., Ltd., Changsha 410004, China)

Clc Number:

TV651.1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on the initially proposed closure scheme, a physical model test study was conducted for the TB Hydropower Project to analyze the hydraulic parameters of the closure gap under different operational conditions, and it was pointed out that the discharge index is the key factor determining the difficulty of river closure. Under the actual field condition before the closure, the numerical simulation method was used to analyze the hydraulic parameters of the river closure. The results shows that under the same inflow rate, a deterioration in the diversion conditions will significantly increase the difficulty of river closure. The river basin development company adopted the mode of controlling discharge to assist river closure, which effectively reduce the difficulty of river closure by decreasing the discharge from the upper cascade power station, thus completing the river closure successfully. Both the measured data in field and the inversion results from model test demonstrate that this mode can provide a successful reference for the design and implementation of similar projects in river basin cascade development.

    Reference
    Related
    Cited by
Get Citation

杨磊,吴云波,李仲权,等.流域公司上下游电站“控泄助截”截流模式研究[J].水利水电科技进展,2024,44(z1):79-82.(YANG Lei, WU Yunbo, LI Zhongquan, et al. Study on “controlling discharge to assist river closure” mode for upstream and downstream power stations of river basin company[J]. Advances in Science and Technology of Water Resources,2024,44(z1):79-82.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 03,2024
  • Revised:
  • Adopted:
  • Online: April 06,2025
  • Published:
Article QR Code