Manufacturing planning and implementation of “zero counterweight” for the runner of TB Hydropower Project
CSTR:
Author:
Affiliation:

(Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China)

Clc Number:

TK730.6

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To achieve the goal of “zero counterweight” of TB Hydropower Project runner manufacturing, starting from the equipment procurement stage, they conducted advance planning, through innovative means such as raising standards, adding processes, and introducing new equipment and new technologies, and relying on measures such as organizational guarantee, technical feasibility, and process control, all four runners finally achieved “zero counterweight” manufacturing , making the TB Hydropower Project the first power station in China where all runners have achieved “zero counterweight” manufacturing so far.

    Reference
    Related
    Cited by
Get Citation

兰东宏,齐巨涛,文仁学,等. TB水电工程转轮“零配重”制造策划与实施[J].水利水电科技进展,2024,44(z1):83-85.(LAN Donghong, QI Jutao, WEN Renxue, et al. Manufacturing planning and implementation of “zero counterweight” for the runner of TB Hydropower Project[J]. Advances in Science and Technology of Water Resources,2024,44(z1):83-85.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 15,2024
  • Revised:
  • Adopted:
  • Online: April 06,2025
  • Published:
Article QR Code