Application research on key technologies for automated monitoring during the construction period of TB Hydropower Project
CSTR:
Author:
Affiliation:

(1.POWERCHINA Kunming Engineering Corporation Limited, Kunming 650051, China;2.Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China)

Clc Number:

TV134.1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    From the early stages of construction, the TB Hydropower Project has simultaneously implemented automated monitoring. In an environment with no permanent power supply, no conditions for wired communication, and significant construction interference, solutions were devised based on the on-site situation. Power supply issues were resolved using solar energy, temporary construction power sources, or batteries with low-power self-sleep modes. Communication issues were addressed using wireless communication, temporary optical cables, and LORA signal relays. These measures successfully realized high-frequency, long-duration automated observations during the construction period, ensuring the completeness of monitoring data throughout the entire construction period. Upon completion of construction, the related systems can be seamlessly transitioned into a permanent automated monitoring system, providing robust data support for guiding construction, monitoring, and early warning.

    Reference
    Related
    Cited by
Get Citation

董常文,邹兴宏,王李俊,等. TB水电工程施工期监测自动化关键技术应用研究[J].水利水电科技进展,2024,44(z1):86-90.(DONG Changwen, ZOU Xinghong, WANG Lijun, et al. Application research on key technologies for automated monitoring during the construction period of TB Hydropower Project[J]. Advances in Science and Technology of Water Resources,2024,44(z1):86-90.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 23,2024
  • Revised:
  • Adopted:
  • Online: April 06,2025
  • Published:
Article QR Code