(1.POWERCHINA Kunming Engineering Corporation Limited, Kunming 650051, China;2.Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China)
TV134.1
董常文,邹兴宏,王李俊,等. TB水电工程施工期监测自动化关键技术应用研究[J].水利水电科技进展,2024,44(z1):86-90.(DONG Changwen, ZOU Xinghong, WANG Lijun, et al. Application research on key technologies for automated monitoring during the construction period of TB Hydropower Project[J]. Advances in Science and Technology of Water Resources,2024,44(z1):86-90.(in Chinese))
Copy
