Factors affecting the construction period of the main project of a large-scale pumped storage power station and optimization measures
CSTR:
Author:
Affiliation:

(Sinohydro Engineering Bureau 8.Co., Ltd., Changsha 410004, China)

Clc Number:

TV743

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In response to the current heavy construction task and tight construction period of pumped storage power stations, this study focuses on the construction period of the main project of large-scale pumped storage power stations, analyzes the influencing factors and their importance on the construction period of the main project, and based on field research and statistical analysis, constructs an explanatory structural model (ISM) of the influencing factors through the development of Boolean operation program code.The results indicate that terrain and landform conditions are important factors affecting the construction period. Specific schedule optimization measures have been proposed for different construction routes, including technical measures, organizational measures, management measures, and economic measures.

    Reference
    Related
    Cited by
Get Citation

谭峰,周洪云.大型抽水蓄能电站主体工程施工工期影响因素及优化措施[J].水利水电科技进展,2024,44(z1):101-105, 124.(TAN Feng, ZHOU Hongyun. Factors affecting the construction period of the main project of a large-scale pumped storage power station and optimization measures[J]. Advances in Science and Technology of Water Resources,2024,44(z1):101-105, 124.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 25,2024
  • Revised:
  • Adopted:
  • Online: April 06,2025
  • Published:
Article QR Code