(1.Sinohydro Engineering Bureau 8.Co., Ltd., Changsha 410004, China;2.Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China)
TV642.2
吴都督,段川,罗长青,等.碾压混凝土坝高升层连续翻升技术及模板稳定性分析[J].水利水电科技进展,2024,44(z1):106-110.(WU Dudu, DUAN Chuan, LUO Changqing, et al. Continuous lifting technology and formwork stability analysis for high lifting layers of roller-compacted concrete dam[J]. Advances in Science and Technology of Water Resources,2024,44(z1):106-110.(in Chinese))
Copy
