    Abstract:

    In order to fully utilize the advantage of the rapid rise of roller-compacted concrete (RCC), this paper proposes a scheme of adopting continuous lift-up construction combined with intelligent construction technology during the low-temperature season to ensure the rapid lift of the dam. Before construction, the numerical simulation method is used to calculate the load distribution under different lift heights, and the stress and displacement states of the formwork during the lift-up construction process are analyzed, so as to ensure the stability and safety of the formwork during the lift-up process. The application practice in the TB Hydropower Station shows that this technology is convenient in construction, safe and stable, and can ensure that the cast concrete has excellent appearance quality.

    Reference
    Related
    Cited by
Get Citation

吴都督,段川,罗长青,等.碾压混凝土坝高升层连续翻升技术及模板稳定性分析[J].水利水电科技进展,2024,44(z1):106-110.(WU Dudu, DUAN Chuan, LUO Changqing, et al. Continuous lifting technology and formwork stability analysis for high lifting layers of roller-compacted concrete dam[J]. Advances in Science and Technology of Water Resources,2024,44(z1):106-110.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 02,2024
  • Revised:
  • Adopted:
  • Online: April 06,2025
  • Published:
Article QR Code