Application of paving method of large inclined layer through the warehouse in TB Hydropower Project
CSTR:
Author:
Affiliation:

(1.Sinohydro Engineering Bureau 8.Co., Ltd., Changsha 410004, China;2.Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China)

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In view of the fact that the traditional large warehouse surface flat layer paving process has the inter-layer interval time overtime, and the large warehouse surface needs to be divided into multiple small warehouse surfaces for construction, resulting in the waste of warehouse resources, combined with the sub-warehouse structure, climatic characteristics and warehouse intensity of TB Hydropower Project, the large inclined layer paving method is used to achieve long-term continuous pouring, so that it is not affected by rainfall, which maximizes the utilization rate of the equipment and ensures the quality of the interlayer combination.

    Reference
    Related
    Cited by
Get Citation

肖镍,赵银超,安辉,等.通仓大斜层铺筑法在TB水电工程中的运用[J].水利水电科技进展,2024,44(z1):120-124.(XIAO Nie, ZHAO Yinchao, AN Hui, et al. Application of paving method of large inclined layer through the warehouse in TB Hydropower Project[J]. Advances in Science and Technology of Water Resources,2024,44(z1):120-124.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 23,2024
  • Revised:
  • Adopted:
  • Online: April 06,2025
  • Published:
Article QR Code