Method for establishing construction survey control network for large and medium-sized hydropower stations
CSTR:
Author:
Affiliation:

(1.Sinohydro Engineering Bureau ;4.Co., Ltd., Xining 810007, China;2.Tuoba Hydroelectric Engineering Construction Management Bureau of Huaneng Lancang River Hydropower Inc., Diqing 674608, China)

Clc Number:

TV522

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Construction surveying work is the fundamental work that runs through the entire process of engineering construction, playing a crucial role in ensuring the quality of engineering construction. The accuracy, layout principles, layout forms, and internal and external work of the construction surveying control network for large and medium-sized hydropower stations must comply with the requirements of the engineering project itself and relevant technical standards. Strict control and careful construction should be carried out at each step to establish a high-precision and user-friendly construction surveying control network.

    Reference
    Related
    Cited by
Get Citation

熊世旺,何金龙,郭锋,等.大中型水电站施工测量控制网的建立方法[J].水利水电科技进展,2024,44(z1):125-126, 158.(XIONG Shiwang, HE Jinlong, GUO Feng, et al. Method for establishing construction survey control network for large and medium-sized hydropower stations[J]. Advances in Science and Technology of Water Resources,2024,44(z1):125-126, 158.(in Chinese))

Copy
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 26,2024
  • Revised:
  • Adopted:
  • Online: April 06,2025
  • Published:
Article QR Code